Habiganj Re-excavation of historical village canals and five branch canals has been launched in Banachang.
On Saturday (January 28) at noon, the re-excavation program was launched at Kundupaz, No. 4 of the 4th Union of Samat Upazila.
Ed. Abdul Majeed Khan, president of the parliamentary standing committee regarding the bills of local members and private members and the proposal of private members, was inaugurated.
On this occasion, I am very happy to work in the work of the historical memorial of my ancestors, I felt proud to leave a beautiful green future for the next generation.
I have raised three hundred crore rupees in Banitachong upazila, the work of self-satisfaction is the work of re-excaving the canal of Gaj.
I am seeking everyone's cooperation to continue the development of Banitachong in the beautiful future and the development of Banitachang.
Banitachong Upazila Parishad Chairman Abul Kasem Chowdhury presided over the meeting as the chief guest.
HITITUMU SITE MELIGH LIGAR LIST MESHER SHOUSTAN MITURE SPECIAL GUIDE, HUMINARY POLIGARD CANDIAL CANDIAN SHOUty MEETING SPECIAL CASERI SITE HITAR POLICION SITE HITICAL , HUMMIN LIKE SITE CHARITIC LIAGIN SITUARY CHARITY CHITECT MISCELLANEOGIC ATM SIAM LIKE MIZARMAN KHAN DISCLAIMER
Banitachong village, known as the capital of the ancient Laur kingdom, has 15 units in the village, including four units currently located inside the village of Banitchong.
A protective vegetative canal exists around the village of Banachong which was created immediately after the construction of this village.
The canal of time has become narrower than filling.
Also, this historic canal was about to go to the loss due to encroachment and pollution.
already The canal is filled and encroached, waterlogging, irrigation and watering are causing problems in deep and shallow tube wells.
Excavation work has started through the project of digging the canal canal with the money allocated 7 crore 16 lakh 15 thousand rupees under the supervision of the Water Development Board.
Its ceremonial inauguration will be held on Saturday 28 January.
According to a source of the Panel Unana Board, through the Gor Canal Drilling Project, 15 km in Gaj Canal Part-1 and Goer Khal Part-2 and 5 more branch canals will be dug through the same project, which will have a total length of 31.600 km.
The width below part-1 and part-2 of the canal can be 7 meters.
The width below the branch canals will be from 6 meters to 1.80 meters.
4 thousand trees will be planted on the banks of the Ghar canal.
The project officials say that the project is being carried out with great caution and careful supervision.The excavation work is completed with everyone's support.
If the project is implemented, the waterways will be built and the water shortage will be created in the canal, along with the irrigation facilities and water shortages.
