Bangabandhu railway bridge is being built by the sweat of 4 thousand workers in Sae
300 meters north of Yamuna river is being built in the country The long railway bridge under construction at Tk 16,780,960,000, a large railway, or a railway bridge, is 4.80 km long, with the tireless work and sweat of 4,000 workers, one of the largest railway bridges in the inter-Ashita railway. At present, 62 percent of the work of the bridge has been completed. According to the Bangabandhu Sheikh Mujib Railroad Bridge Project Office, the railway line was connected to the Bangabandhu Bridge built on the Yamuna River, but the train was crossing the bridge at a slow pace.
