Kamalnagar (Laxmipur) Representative: The southern part of the important public Amanita Road in Otada Ditteo Hazirhat Unigan Parishad in Kamalnagar, Kamalnagar, Laxmipur, which is currently the southern part of the Jagrani School Road, which has not been done by the public representatives for 20 years.
According to the local sources, Amanita Road is currently a 1 km road which is connected to the College Road called Jagrani School Road. One kilometer of this road is in 2000 but the remaining half a kilometer road is unpaved in 20 years and has not even a handful of soil in the 40-day schedule.
The road is seen in the land and documents called Amanita Road and Jagrani School Road. The upazila engineer could not take up any project with two names.
Some of the roads are mixed with the fields along the road and in some places the road is broken and most of them are in the canal. Also, there are brick holes in the soling road of the age of the year, so that no vehicles including rickshaws, bicycles, motorcycles can move. Parents are having to suffer the misfortune of school children, children are seen in various cases, they collide with broken bricks and children are victims of accidents.
It is known that this road was used to go to the Hat of Qadir Pundit (now disappeared in the womb of the river) which is a witness of Google Map time, the road is in bad condition for a long time and the people of those areas have to move on the distant road.
In the last financial year 2018-2019, the program called Amanita Road was closed, but there is no project in the name of this road in the financial year 2021-2022, even though 50 lakh rupees have been allocated for the poor in the financial year 2021-2022.
Not even a handful of soil has been collected for a long time, this road is not only that, but this is the real picture of Hazirhat Unitan even though the paper is being fixed every year.
Local resident and JSD general secretary Shahadat Hossain Nirab said that the brick wall has been broken and the hole that is not suitable for movement is not coming.
When asked by the road poisoner Nizam Uddin, he said, "I have no response at present. When asked about the poisoning of the road with the field, he said that it is not a small project to bring it under any project.
Upazila Engineer Md. Sohail Anaar said, Kamalnagar has been sent from the Upazila Directorate of Engineers for inclusion in JNP-4 (DPP).
