{"id":7293,"date":"2019-01-10T09:15:37","date_gmt":"2019-01-10T03:15:37","guid":{"rendered":"http:\/\/pollinews.com\/?p=7293"},"modified":"2019-01-10T09:15:37","modified_gmt":"2019-01-10T03:15:37","slug":"%e0%a6%95%e0%a6%ae%e0%a6%b2%e0%a6%a8%e0%a6%97%e0%a6%b0-%e0%a6%b0%e0%a6%95%e0%a7%8d%e0%a6%b7%e0%a6%be%e0%a7%9f-%e0%a6%ae%e0%a7%87%e0%a6%98%e0%a6%a8%e0%a6%be%e0%a6%b0-%e0%a6%a4%e0%a7%80%e0%a6%b0","status":"publish","type":"post","link":"https:\/\/pollinews.com\/en\/%e0%a6%95%e0%a6%ae%e0%a6%b2%e0%a6%a8%e0%a6%97%e0%a6%b0-%e0%a6%b0%e0%a6%95%e0%a7%8d%e0%a6%b7%e0%a6%be%e0%a7%9f-%e0%a6%ae%e0%a7%87%e0%a6%98%e0%a6%a8%e0%a6%be%e0%a6%b0-%e0%a6%a4%e0%a7%80%e0%a6%b0\/","title":{"rendered":"Kamalnagar Rakshata Meghna Bank Protection Dam is essential"},"content":{"rendered":"<div id=\"contentDetails\">\n<p><strong>Lakshmipur ;;<\/strong><\/p>\n<p>The river has left thousands of families destitute in the rivers of Laxmipur due to river erosion during the monsoon season, which has been swallowed by many public and private structures.<\/p><\/div>\n<div id=\"contentDetails\">\n<p>In the last year, the one kilometer of the banks of the upazila collapsed at least eight times. The people of this town are now disorientated by the fear of river erosion.<\/p>\n<p>The residents of Kamalnagar have given programs like human chain, meetings and blockades to avoid the devastation. In the face of demands, the construction of one kilometer of arrow protection dam has been completed last year. Only one kilometer dam is enough in Kamalnagar.<\/p>\n<p>The second tier of Kamalnagar river bank protection dam is supposed to be the work of the second tier, but it has not seen the light of day. If the work of the second phase is not started in the fast, the river has been destroyed in the river.<\/p>\n<p>The dam has been seen to have collapsed at least eight times in the last year of the dam in the Matabbarhat Tir Raksha Dam area, which has been seen in the area of the dam in the last year. In the last year, the dam has been threatened. If the damaged dam is not repaired and more dams are not constructed on both sides, there will be a disaster for Kamalnagar.<\/p>\n<p>Locals said that last monsoon has been protected by the construction of one kilometer bank of bank protection, several areas including Matabbarhat Bazar have been saved. The dam is not under threat of the second level. Before the next monsoon, it is necessary to renovate the dam protection dam and build another eight kilometer dam. The people of the affected areas say that the candidates have assured the system of preventing the erosion of the Meghna before the 11th National Assembly elections.<\/p>\n<p>Saifuddin Azam, organizing secretary of Kamalnagar Upazila Aomi League and affected by river erosion, said that in the main development project proposal (DPP) from the financial year 2016-17, there have been guidelines for the construction of an eight kilometer dam in the second phase of Kamalnagar in the year 2016-17.<\/p>\n<p>The 11th nationality was elected from the Grand Alliance of the Parliament and the next day he met the leaders and workers in Hazirhat Bazar and assured that the work of river erosion would be prevented.<\/p>\n<p>Earlier in 2014, the government allocated Tk 198 crore for the protection of the Meghna river bank dam. The allocation money was about one kilometer in Kamalnagar, three kilometers in Alexander of Ramgatti and one kilometer dam in Ramgatirhat Machghat area under the supervision of the army on February 1, 2015 under the supervision of the army, 19 engineering construction battalion Batligant 19 Engineers Aleksandar area and the construction of the 19th century.<\/p>\n<p>Meanwhile, the allocation of Tk 48 crore is available in Kamalnagar, Naratanganj Dockyering Engineering Limited. In early 2016, the company gave ottern engineering in early 2016. Started work. That year, poor quality sand and geo bags were given The work was stopped under the pressure of the locals to protest and demand to work properly.<\/p>\n<p>On March 14, 2017, Prime Minister Sheikh Hasina inaugurated the Ramgati-Kamalgar river bank dam, which she assured the work of the second level, and the locals hope that the work of the second phase will start to prevent the erosion in the same fast.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u09b2\u0995\u09cd\u09b7\u09cd\u09ae\u09c0\u09aa\u09c1\u09b0: \u09ac\u09b0\u09cd\u09b7\u09be \u09ae\u09cc\u09b8\u09c1\u09ae\u09c7 \u09a8\u09a6\u09c0 \u09ad\u09be\u0999\u09a8\u09c7\u09b0 \u0995\u09ac\u09b2\u09c7 \u09aa\u09a1\u09bc\u09c7 \u09b2\u0995\u09cd\u09b7\u09cd\u09ae\u09c0\u09aa\u09c1\u09b0\u09c7\u09b0 \u0995\u09ae\u09b2\u09a8\u0997\u09b0 \u0989\u09aa\u099c\u09c7\u09b2\u09be\u09b0 \u0995\u09af\u09bc\u09c7\u0995 \u09b9\u09be\u099c\u09be\u09b0 \u09aa\u09b0\u09bf\u09ac\u09be\u09b0\u0995\u09c7 \u09a8\u09bf\u0983\u09b8\u09cd\u09ac \u0995\u09b0\u09c7\u099b\u09c7 \u09b0\u09be\u0995\u09cd\u09b7\u09c1\u09b8\u09c7 \u098f \u09a8\u09a6\u09c0\u0964 \u0997\u09bf\u09b2\u09c7\u099b\u09c7 \u09ac\u09b9\u09c1 \u09b8\u09b0\u0995\u09be\u09b0\u09bf-\u09ac\u09c7\u09b8\u09b0\u0995\u09be\u09b0\u09bf \u09b8\u09cd\u09a5\u09be\u09aa\u09a8\u09be\u0964 \u0985\u09ac\u09cd\u09af\u09be\u09b9\u09a4 \u09ad\u09be\u0999\u09a8\u09c7 \u0989\u09aa\u099c\u09c7\u09b2\u09be\u09b0 \u09a4\u09bf\u09a8 \u09ad\u09be\u0997\u09c7\u09b0 \u098f\u0995\u09ad\u09be\u0997 \u098f\u0996\u09a8 \u09a8\u09a6\u09c0 \u0997\u09b0\u09cd\u09ad\u09c7\u0964 \u0997\u09a4 \u09a6\u09c7\u09dc \u09ac\u099b\u09b0\u09c7 \u0989\u09aa\u099c\u09c7\u09b2\u09be\u09b0 \u098f\u0995 \u0995\u09bf\u09b2\u09cb\u09ae\u09bf\u099f\u09be\u09b0 \u09a4\u09c0\u09b0 \u09b0\u0995\u09cd\u09b7\u09be \u09ac\u09be\u0981\u09a7\u09c7 \u09a7\u09b8 \u09a8\u09c7\u09ae\u09c7\u099b\u09c7 \u0985\u09a8\u09cd\u09a4\u09a4 \u0986\u099f \u09ac\u09be\u09b0\u0964 \u098f \u099c\u09a8\u09aa\u09a6\u09c7\u09b0 \u09ae\u09be\u09a8\u09c1\u09b7 \u098f\u0996\u09a8 \u09a8\u09a6\u09c0 \u09ad\u09be\u0999\u09a8 \u0986\u09a4\u0999\u09cd\u0995\u09c7 \u09a6\u09bf\u09b6\u09c7\u09b9\u09be\u09b0\u09be\u0964 \u09ad\u09be\u0999\u09a8 \u09b0\u09cb\u09a7\u09c7 [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":7294,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-7293","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/posts\/7293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/comments?post=7293"}],"version-history":[{"count":1,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/posts\/7293\/revisions"}],"predecessor-version":[{"id":7295,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/posts\/7293\/revisions\/7295"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/media\/7294"}],"wp:attachment":[{"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/media?parent=7293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/categories?post=7293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pollinews.com\/en\/wp-json\/wp\/v2\/tags?post=7293"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}